Delivery Windows and Buffer Stock: How Do Buyers Set Them Right?

Delivery Windows and Buffer Stock: How Do Buyers Set Them Right?

Most late orders were not late because the factory was slow. They were late because the window was agreed before anyone calculated what it actually contained.

Production planning board with delivery calendars and order slot markers
Production planning board with delivery calendars and order slot markers

A delivery window is a commitment with a tolerance, and a buffer is the money a buyer pays to make that tolerance real. Set the window too tight and the buffer becomes emergency air freight. Set it too wide and the buffer becomes dead stock that has to be marked down.

Table of Contents

The factory’s view: a window you can hit every month is worth more than a window you hit once. Predictability is a product feature, and buyers underwrite it with their own inventory.

Why Delivery Windows Are Usually Wrong

Windows are typically set by copying what the last supplier did, or by subtracting a plausible number of weeks from a launch date, rather than by building them from the components that actually consume time.

The result is a commitment with no owner. Nobody can say which day the window was calculated, what transit assumption it used, or which production stage is the constraint.

The Origin Table

Source of window Reliability
Calculated from stages High
Copied from last order Medium
Supplier verbal estimate Low
Backwards from launch Low
Buyer assumption Very low
Contract template Low

The Failure Table

Fault Consequence
No component breakdown Hidden slack
Single point estimate No tolerance
Optimistic transit Chronic lateness
No review cadence Drift
No owner Nobody fixes it
Penalty without data Dispute

The Why Spend Table

Error Cost bearer
Window too tight Buyer expedites
Window too wide Buyer carries stock
No tolerance stated Both argue
No review Margin erodes
No data Repeat next season
No penalty No discipline

Anatomy of a Lead Time

A lead time is a chain of stages, and the honest way to build a window is to measure each link rather than to guess the total.

The Stage Table

Stage Typical share
Specification freeze Small
Sampling and approval Large
Material procurement Large
Production Largest
Inspection Small
Packing Small
Transit Large

The Anatomy Feed Table

Input Affects
Material stock Procurement
Order quantity Production
Colour count Both
Hardware sourcing Procurement
Line capacity Production
Approval speed Sampling

The Variability Table

Stage Predictability
Sampling Low
Material Medium
Production High
Inspection High
Packing High
Transit Low

Safety Stock Mathematics

The formula itself is not the hard part. The hard part is admitting that the lead time variability a buyer plugs into it is usually a promise rather than a measurement, which makes the output look precise while being anchored to optimism.

Safety stock exists to absorb the difference between what was expected and what happened, and it can be sized rather than guessed.

The standard approach multiplies a service factor by the combined variability of demand and lead time. The formula is simple; the discipline is in feeding it real numbers.

The Formula Table

Element Meaning
z Service factor
Sigma demand Demand variability
Lead time Replenishment days
Sigma lead Lead time variability
Combined Root sum
Buffer Result

The Service Table

Service level Factor
Eighty five Low
Ninety Moderate
Ninety five Common
Ninety eight High
Ninety nine Very high
Ninety nine point nine Costly

The Safety Feed Table

Input Source
Daily demand Sales history
Lead time Actual arrivals
Sigma demand Standard deviation
Sigma lead Arrival spread
Review period Planning cycle
Service target Commercial policy

The fastest improvement is rarely a better formula. It is measuring the actual arrival spread instead of using the forwarder’s promise as the standard deviation.

Demand and Lead Time Variability

Two shipments with the same average transit can have very different reliability, and only the spread tells you which one needs a larger buffer.

The Pattern Table

Pattern Buffer need
Stable demand Small
Seasonal Larger
Promotional Largest
New product Unknown
Declining Moderate
Lumpy orders Large

The Lead Table

Pattern Buffer need
Fixed weekly sailing Small
Fortnightly Moderate
Monthly Larger
Consolidation Larger
Peak season Largest
Multi leg Largest

The Trap Table

Trap Effect
Average hides spread Understock
Best case planning Chronic shortage
Ignoring peaks Stockout
Ignoring ramp Excess
Single lane data Wrong buffer
No update Drift

Structuring the Window in the Contract

A window should be written as an interval with named conditions, not as a single date with an implied promise.

The workable form names a ready date at the factory, an inspection window, a sailing or pickup window, and an arrival window at destination. Each of those is separately measurable, which means each failure can be attributed to the party who caused it.

The Clause Table

Element Purpose
Ready date Factory commitment
Inspection window Quality gate
Departure window Booking
Arrival window Transit
Tolerance Acceptable slip
Remedy What happens

The Attribution Table

Slip cause Responsible
Late materials Factory
Late approval Buyer
Failed inspection Factory
Missed sailing Booking party
Port congestion Neither
Customs query Documents

The Structuring Cure Table

Remedy Suits
Air upgrade share Short slip
Discount Commercial
Priority next order Relationship
Cancellation right Severe
Penalty credit Contract
No remedy Low value

Promising What You Can Hold

A delivery promise is a forecast with a signature on it, and the parties who keep promises are the ones who state their assumptions openly.

Buyers should expect a supplier to say what has to be true for the date to hold: approval by a certain day, material in house by a certain week, a specific sailing. A supplier who will not name those conditions is either guessing or unwilling to be held to a number.

The Promise Table

Statement Quality
Fixed date, no conditions Poor
Date plus conditions Good
Range plus conditions Best
Date minus explanation Poor
Range with history Strong
Silence Unusable

The Condition Table

Condition Typical
Approval date Two weeks
Material lead Three weeks
Line slot Per schedule
Inspection booking One week
Sailing Weekly
Documents Three days

The Promising Cadence Table

Cadence Question
Weekly On track
At material in Risk
At line start Confident
At inspection Pass
At dispatch Confirmed
Post arrival Actual

Where the Buffer Should Sit

Most buyers default to finished goods because that is the position they can see. The visible position is rarely the cheapest one, and moving the buffer upstream usually releases the same protection for a fraction of the holding cost.

Buffer does not have to be finished goods. It can sit as material, as cut parts, as semi finished shells or as packed cartons, and each location has a different cost and a different response time.

Buffer stock pallets of finished cartons in a warehouse location area
Buffer stock pallets of finished cartons in a warehouse location area

The Position Table

Position Response
Raw material Weeks
Cut parts Days
Semi finished Days
Finished unpacked Hours
Packed cartons Immediate
In transit Days
At buyer Immediate

The Where Spend Table

Position Holding cost
Material Low
Cut parts Low
Semi finished Medium
Finished High
Packed Highest
In transit Medium
Buyer stock Highest

The Risk Table

Position Risk
Material Price move
Cut parts Design change
Semi finished Colour mix
Finished Obsolescence
Packed Damage
In transit Delay
Buyer stock Markdown

A factory holding finished goods for a buyer is carrying the buyer’s risk without the buyer’s margin. That is a commercial decision, and it should be priced or capped rather than assumed.

Buffer at the Factory Versus at the Buyer

The cheapest buffer is usually the one closest to the constraint, and the constraint is almost never the retail shelf.

The Buffer Versus Table

Option Strength
Factory holds Flexible mix
Forwarder holds Near port
Buyer holds Immediate
Third party Scalable
In transit Free float
Store level Sellable

The Constraint Table

Constraint Best buffer
Long material lead Material
Long production Semi finished
Long transit Destination
Volatile demand Finished
Many colours Semi finished
Few colours Finished

The Buffer Tradeoff Table

Option Weakness
Factory holds Control
Forwarder holds Cost
Buyer holds Capital
Third party Visibility
In transit Fixed
Store level Space

Peak Season Lead Time Inflation

The correct planning response is not to negotiate a shorter peak lead time. It is to place peak orders earlier, freeze specifications sooner and accept that the calendar, not the supplier, is the binding constraint in the four months before a major season.

Lead times are not constant through the year, and the mistake most buyers make is to plan a peak season order with an off season lead time.

Everything lengthens at once in the weeks before a major retail season: material mills run behind, hardware suppliers allocate, factories fill their lines, forwarders run out of space and ports slow down. The effect compounds rather than adds.

The Inflation Table

Element Peak change
Material lead Longer
Line availability Tighter
Inspection slots Scarcer
Sailing space Scarce
Transit spread Wider
Rate level Higher

The Capacity Table

Signal Meaning
Enquiry surge Sell early
Deposit delays Cash tight
Overtime Capacity full
Subcontracting Risk
New lines Ramp risk
Sample queue Backlog

The Planning Table

Month Action
Four before Book capacity
Three before Freeze specs
Two before Materials in
One before Production
Departure month Inspect
Launch month Buffer

Capacity, Slots and Real Constraints

A factory that says yes to everything is telling you something about how it plans, and it is rarely something reassuring.

Real capacity is expressed as line hours per week, and a good supplier can tell you how many of those hours your order consumes. That number is the basis of every honest lead time conversation.

The Measure Table

Measure Use
Line hours Capacity
Pieces per hour Productivity
Changeover time Loss
Defect rate Rework
Absence rate Real hours
Utilisation Headroom

The Question Table

Ask Reveals
How many lines Scale
Hours per line Capacity
Utilisation Headroom
Changeovers Flexibility
Subcontract Honesty
Peak booking Discipline

The Capacity, Tells Table

Answer Reading
Specific hours Professional
Vague capacity Guessing
Always available Oversold
No peak limit Risky
Subcontracts yes Transparent
Hides subcontract Warning

Transport Mode and Window Width

Air freight is often described as expensive, and measured against a full container it is. Measured against four weeks of lost sales in a short season it can be the cheapest line in the plan, which is why the comparison has to be made against the stockout cost rather than against the sea rate.

The mode decides how wide the arrival window has to be, and the width of that window is a real cost even when the freight rate looks cheap.

The Mode Table

Mode Arrival spread
Courier Narrow
Air Narrow
Rail Moderate
FCL sea Moderate
LCL sea Wide
Multi leg Widest

The Transport Spend Table

Mode Buffer cost
Courier Low stock
Air Low stock
Rail Moderate
FCL sea Larger
LCL sea Largest
Multi leg Largest

The Choice Table

Situation Mode
Launch Air plus sea
Replenishment Sea
Promotion Air
Small order LCL
Bulk FCL
Emergency Courier

Clearance and Release Timing

The window does not end when the ship arrives. It ends when the goods are released, and release depends on documents and money rather than on the ocean.

A buyer who plans to the arrival date rather than to the release date will consistently be short, because clearance routinely consumes days and occasionally consumes weeks when a query arises.

The Step Table

Step Typical
Arrival notice On arrival
Document check Days
Duty payment On demand
Release After
Delivery order After
Haulage booking Days

The Hold Table

Cause Delay
Value query Days
Code query Days
Missing certificate Days
Payment pending Until paid
Inspection Days
Agent error Days

The Prevention Table

Action Effect
Pre clearance Days saved
Correct codes No query
Documents early No hold
Duty funded No wait
Broker briefing Fewer errors
Arrival check Early notice

Receiving Capacity at Destination

A delivery window is only real if someone can receive the goods, and warehouse calendars are a constraint that factories cannot see.

The Dock Table

Constraint Effect
Dock slots Delay
Labour shifts Delay
Pallet space Overflow
System cut off Next day
Appointment rules Delay
Holiday Closure

The Appointment Table

Lead time Effect
Same day Rare
One day Common
Three days Standard
One week Peak
Two weeks Promotion
None Fines

The Receiving Spend Table

Failure Cost
Missed slot Re booking
Waiting truck Hourly
Overflow storage Per pallet
Overtime receive Premium
Re delivery Both
Late listing Sales

Splitting Orders to Narrow the Window

A split order also changes the conversation inside the factory. Two smaller commitments with fixed dates are easier to schedule than one large commitment with a soft date, and they give the buyer an early read on quality before the whole quantity is committed.

A single large delivery creates a single large risk, and splitting it is often cheaper than buffering it.

Buyer and factory manager reviewing lead time figures and a schedule
Buyer and factory manager reviewing lead time figures and a schedule

The Split Table

Split Benefit
Two shipments Earlier first arrival
Three shipments Smoother cash
Colour split Sell through
Size split Test sizes
Market split Per region
Air plus sea Launch cover

The Splitting Spend Table

Split Extra cost
Two sailings Two bookings
Three sailings Admin
Partial air Freight
Repack Labour
Separate labels Small
Separate docs Small

The Splitting Code Table

Condition Split
New market Yes
Proven seller No
Long transit Yes
Short season Yes
Large volume Yes
Small order No

Rolling Replenishment

The most reliable window is not a date but a rhythm: a fixed order cycle with a fixed lead time, reviewed against actual sell through.

The Cycle Table

Cycle Suits
Weekly Fast sellers
Fortnightly Standard
Monthly Bulk
Quarterly Basics
Seasonal Fashion
On demand Made to order

The Rolling Tells Table

Signal Action
Sell through fast Increase
Sell through slow Hold
Stock cover low Expedite
Stock cover high Delay
Returns rising Reduce
Reorder rate Adjust

The Rolling Guardrail Table

Control Purpose
Cover weeks Visibility
Open orders Commitment
In transit Pipeline
At factory Buffer
At buyer Availability
Forecast error Learn

Communicating a Slip

Slippage is normal; silence is not. The damage from a late order is mostly caused by discovering it late rather than by the delay itself.

The Timing Table

Discovery Damage
At material in Little
At line start Moderate
At inspection Serious
At dispatch Severe
At arrival Worst
By the buyer Fatal

The Message Table

Element Content
Fact What slipped
Cause Why
Impact New date
Options Air, split
Cost Who pays
Prevention Next time

The Recovery Table

Option Trade
Partial air Cost
Split shipment Admin
Priority line Other orders
Subcontract Risk
Reduce scope Volume
Accept slip Sales

The Cost of Service Level

Every point of service level costs progressively more, because the buffer grows faster than the benefit at the top end.

The Curve Table

Service Buffer
Eighty five Small
Ninety Moderate
Ninety five Large
Ninety eight Larger
Ninety nine Very large
Last point Disproportionate

The Value Table

Stockout Cost
Lost unit Margin
Lost customer Lifetime
Lost listing Ranking
Emergency air Multiples
Substitution Smaller margin
Goodwill Hard to price

The Balance Table

Category Service
Core basics High
Seasonal Medium
Fashion Medium
Test lines Low
Contract supply Per penalty
Spare parts Medium

Measuring Buffer Performance

A buffer that is never reviewed becomes permanent, and permanent buffer is indistinguishable from waste.

The Metric Table

Metric Meaning
Cover weeks Stock depth
Fill rate Service
Stockout days Failure
Excess weeks Waste
Turns Efficiency
Ageing stock Risk

The Measuring Cadence Table

Cadence Decision
Weekly Replenish
Monthly Adjust
Quarterly Reset
Per season Rebuild
Per launch Test
Annual Policy

The Action Table

Signal Action
Cover rising Cut order
Stockouts rising Raise buffer
Fill rate falling Investigate
Ageing rising Liquidate
Turns falling Reduce
Air freight rising Recalculate

Buffer and Cash

Buffer is capital, and the cost of that capital belongs in the landed cost calculation rather than in a separate finance discussion.

The Capital Table

Element Cost
Goods value Financing
Duty paid Financing
Freight Financing
Storage Rent
Insurance Premium
Obsolescence Write down

The Comparison Table

Option Cash
Larger buffer Tied
Air freight Spent
Penalty Spent
Stockout Lost
Cheaper material Saved
Longer transit Tied

The Decision Table

Condition Choice
Cheap capital Buffer
Expensive capital Air
Short shelf life Low buffer
Stable demand Buffer
Peak risk Buffer early
Penalty heavy Buffer

First Orders Versus Repeat Orders

This is why a supplier quoting a first order and a repeat order at the same lead time is worth questioning. Either the first order window is padded, or the repeat window is optimistic, and both are worth clarifying before the purchase order is signed.

The first order of a style carries work that repeat orders do not, and quoting the same window for both is a common source of quiet disappointment.

A first order needs sampling rounds, material approval, colour matching, hardware confirmation and often a pre production meeting. A repeat order reuses all of that, and the difference can be three or four weeks.

The First Versus Table

Element First order
Sampling Multiple rounds
Material approval Required
Colour match Required
Hardware Confirmed
Pre production Meeting
Line trial Sometimes

The Repeat Table

Element Repeat order
Sampling Skipped
Material Known
Colour Reference
Hardware In stock
Pre production Rare
Line trial No

The First Cushion Table

Order type Buffer
First order Largest
Second order Large
Repeat Moderate
Programme Small
Rush Air

The Sampling Clock

Approval delays are the most common cause of a slipped first order, and they are almost entirely within the buyer’s control.

The Round Table

Round Typical
Proto Weeks
First sample Weeks
Revision Days
Counter sample Weeks
Pre production Weeks
Shipment sample Days

The Delay Table

Cause Days
Late comments Variable
Colour rejection Weeks
Material change Weeks
Hardware change Weeks
Logo revision Days
Artwork Days

The Discipline Table

Rule Effect
One comment round Days saved
Named approver No queue
Colour standard agreed Fewer rejects
Hardware frozen No rework
Artwork early No wait
Deadline stated Focus

If a buyer wants a shorter window on a first order, the most effective action is not pressure on the factory. It is a decision on the sample, in writing, within two working days.

When Quality Delays Delivery

The practical protection is a pre shipment inspection booked at the same time as the booking, with the date written into the schedule. An inspection that has to be squeezed in at the end is an inspection that will be skipped when the pressure arrives.

The pressure of a window is the most common reason a factory ships something it should have fixed, and the buyer who demanded the date is usually the one who pays for it.

A window that cannot accommodate a rework loop is a window that has quietly transferred quality risk to the buyer. The way to keep both is to plan the inspection before the date is committed, not after the goods are packed.

The Conflict Table

Pressure Result
Date fixed Rework skipped
Air cost Deferred defects
Partial ship Mixed quality
Overtime Rushed stitching
Subcontract Uncontrolled
No buffer Claims

The Gate Table

Gate Timing
Incoming material Before cutting
In line First pieces
End line Before packing
Pre shipment Before booking
Loading Before sealing
Arrival On receipt

The When Tradeoff Table

Choice Consequence
Ship all Claim risk
Ship good only Short delivery
Delay Sales lost
Rework fast Cost
Repair at destination Cost, image
Discount Margin

Partial Release Decisions

Shipping the compliant portion of an order is often better than shipping all of it late, but the decision has to be made with the numbers in front of both parties.

The Option Table

Option Suits
Ship good portion Launch date
Hold all Quality
Ship all with credit Relationship
Repair then ship Small defect
Re make Serious
Cancel balance Severe

The Data Table

Needed Purpose
Defect rate Severity
Defect type Fixability
Rework time Recovery
Air cost Comparison
Sales window Urgency
Credit value Settlement

The Recording Table

Item Why
Photos Evidence
Counts Settlement
AQL level Consistency
Sample retained Reference
Written agreement Dispute
Revised date Plan

Dispatch, Delivery and the Last Week

The final week of a window is where most of the visible failure happens, and it is usually the week with the least planning.

Loaded truck at a factory dispatch dock with cartons on the ramp
Loaded truck at a factory dispatch dock with cartons on the ramp

The Sequence Table

Step Owner
Final inspection Factory
Packing completion Factory
Carton marking Factory
Booking confirmation Forwarder
Container loading Station
Document release Both

The Slippage Table

Cause Days
Late packing Days
Missing marks Days
Truck shortage Days
Missed cut off Week
Document error Days
Port queue Days

The Dispatch, Guardrail Table

Control Timing
Packing plan Two weeks
Marking check One week
Booking Two weeks
Truck booking Three days
Document check Three days
Dispatch photo On loading

Recording Actual Performance

Every window should leave behind a number, because the next window is only worth negotiating if you know how the last one performed.

The Record Table

Field Value
Order number Reference
Ready date promised Baseline
Ready date actual Reality
Departure promised Baseline
Departure actual Reality
Arrival actual Result

The Analysis Table

Measure Use
Mean slip Calibration
Spread Buffer size
Cause share Fix priority
Season effect Peak planning
Route effect Lane choice
Supplier effect Allocation

The Feedback Table

Output Consumer
Updated lead time Buyer planning
Buffer size Finance
Cause ranking Supplier review
Lane comparison Logistics
Peak curve Calendar
Contract terms Legal

Keeping the Buffer Honest

A buffer is a hypothesis about the future, and like any hypothesis it should expire if it is not re tested.

The Expiry Table

Trigger Review
New lane Immediately
New supplier First three orders
Demand shift Monthly
Rate change On renewal
Peak passed Reset
Product end Wind down

The Shrink Table

Condition Move
Lead time improved Reduce
Spread narrowed Reduce
Forecast better Reduce
Cost of capital up Reduce
Penalty up Hold
Service up Increase

The Keeping Code Table

Rule Reason
One owner Accountability
Written policy Consistency
Quarterly review Freshness
Data not opinion Accuracy
Link to cash Discipline
No silent change Control

Measuring Lead Time Properly

Measuring lead time means recording two dates for every order and never using the plan as the record.

The Start Table

Candidate start Use
Enquiry date Unreliable
Order date Common
Deposit date Cash tied
Spec freeze Best
Material in Production only
Line start Late

The End Table

Candidate end Use
Packing done Factory end
Dispatch Control transfer
Departure Transit start
Arrival Port
Release Goods usable
Delivered Full chain

The Report Table

Output Interval
Factory lead Freeze to pack
Booking lead Pack to departure
Transit Departure to release
Total Freeze to release
Slip Promised minus actual
Spread Standard deviation

Contract Language That Works

The clause matters less than the data behind it, but a badly written clause can make good data useless.

The Language Table

Phrase Effect
Around Unenforceable
On or before Clear
Subject to Conditional
Best efforts Weak
Window plus remedy Workable
Per calendar days Precise

The Contract Cure Table

Slip Remedy
Under a week No claim
One to two weeks Discussion
Two to four weeks Cost share
Over four weeks Credit
Caused by buyer No remedy
Force majeure Neither

The Proof Table

Evidence Weight
Booking confirmation High
Ready date notice High
Inspection report High
Dispatch photo High
Arrival notice High
Verbal statement None

A Worked Example

A buyer orders eight thousand backpacks for a spring launch, across four colours, shipping to one distribution centre on a monthly sailing.

The Plan Table

Stage Weeks
Sampling Four
Material Three
Production Six
Inspection One
Transit Five
Total Nineteen

The A Cushion Table

Element Buffer
Sample slip One week
Material slip One week
Production slip One week
Transit spread Two weeks
Clearance One week
Total Six weeks

The Reading Table

Question Answer
Is window feasible Yes, at 25 weeks
If 20 weeks Air for part
Biggest risk Sampling
Cheapest fix Faster approval
Where buffer sits Semi finished
Review point Material in

The honest conclusion from that arithmetic is rarely popular: the cheapest way to shorten a window is to decide faster at the front end, not to press harder at the back end.

FAQ

How much buffer stock should a buyer hold for a bag programme?

Size it from the measured spread of past arrivals rather than from a rule of thumb. If actual door to door times have varied by three weeks over the last year, a buffer of three weeks of average sales covers the normal case; anything larger is a commercial decision about risk, not a mathematical one.

Should the buffer be finished goods or raw material?

Put it where the constraint is. If the long pole is fabric lead time, hold fabric. If it is line capacity in peak season, hold semi finished shells. Finished goods are the most expensive place to hold buffer, and they are only justified when demand is genuinely unpredictable or the selling window is very short.

How much do lead times really stretch in peak season?

Commonly by two to four weeks on the same lane, and occasionally more. The stretch comes from several stages at once rather than from one: mills run behind, hardware is allocated, lines fill, space is scarce and ports slow. Plan peak orders with a peak lead time rather than an annual average.

What is a reasonable tolerance on a delivery window?

One to two weeks is workable on sea freight for a repeat order, and three to four weeks on a first order or a consolidated shipment. The tolerance should be written into the contract with a remedy attached, otherwise the buyer has accepted the risk without pricing it.

Who should pay for air freight when an order slips?

The party who caused the slip, which is why the window has to name separate dates for approval, material, ready date, departure and arrival. Without that breakdown every slip becomes an argument, and in practice the buyer usually absorbs the cost even when the cause was a late approval.

Can a factory commit to an arrival date rather than a departure date?

It can commit to a departure window and to a documented transit history, and it should refuse to promise an arrival date it does not control. Buyers who need a firm arrival date are really buying buffer, and it is cleaner to price that buffer than to extract a promise nobody can keep.

How often should buffer levels be reviewed?

Quarterly as a minimum, and after any structural change: a new lane, a new supplier, a rate shift or a demand pattern that has moved. Buffers that are set once and never reviewed are usually too high in stable categories and too low in the categories that actually cause stockouts.

What single metric best predicts a late delivery?

The gap between the promised ready date and the date material actually arrived in house. In most programmes that gap, measured per order, predicts the final slip more reliably than any other early signal, and it is visible weeks before the problem becomes expensive.

Conclusion

Delivery windows and buffer stock are the same decision seen from two sides. A window without a buffer is a hope, and a buffer without a window is inventory nobody can plan around.

The workable method is unglamorous. Break the lead time into stages, measure what each stage actually took, state the window as an interval with conditions attached, put the buffer where the constraint is, and record the actuals so the next window is a calculation rather than a repetition.

A factory that can show a buyer three years of arrival spread, by lane and by season, is offering something more valuable than a shorter promise. It is offering a promise that holds, and that is what a buyer’s inventory plan is actually built on.

Leave a Reply

Your email address will not be published. Required fields are marked *