Freight Consolidation for Bag Exporters: When Does It Pay Off?

Freight Consolidation for Bag Exporters: When Does It Pay Off?

Consolidation is sold as a way to avoid paying for air. Sometimes it is. Sometimes it converts a cheap shipment into an expensive claim.

Consolidation warehouse with cartons from different shipments grouped on pallets
Consolidation warehouse with cartons from different shipments grouped on pallets

A bag order that fills a third of a container has three options: pay for the whole container, ship less than container load and share space, or hold the goods until enough accumulates. Each of those is a different commercial bet, and the right answer changes with volume, value, season and the buyer’s tolerance for delay.

Table of Contents

The honest frame: consolidation trades freight cost against time and control. It rarely saves money without giving something up, and the something is usually visibility.

Why Consolidation Exists

The commercial logic is simple: a buyer who needs a thousand units every six weeks is better served by a steady drumbeat of consolidated sailings than by a container twice a year. What the drumbeat costs is a permanent dependency on someone else schedule.

Container space is sold whole or by the cubic metre, and most bag orders fall between those two products.

A mid-sized order of two thousand backpacks occupies maybe fifteen cubic metres. That is a fraction of a forty foot container and far too much for parcel freight, which is exactly the gap consolidation fills.

The Why Alt Table

Option Suits
Full container High volume
Shared container Mid volume
LCL groupage Low volume
Air freight Urgent, light
Rail Inland long haul
Courier Samples

The Volume Table

Cubic metres Typical choice
Under five LCL or courier
Five to fifteen LCL
Fifteen to thirty LCL or hold
Thirty to fifty Consider FCL
Fifty plus FCL
Full forty foot FCL

The Trade Table

Gain Cost
Lower freight Longer transit
Less capital tied Less control
Frequent shipments More handling
Smaller buffer More risk
Shared booking Shared delay

Cost Structure of LCL and FCL

Compare the two products on the same shipment rather than as tariffs. A rate per cubic metre and a rate per container are not commensurable until both are applied to your actual volume, your actual chargeable weight and your actual destination charges.

The headline rate is not the comparison. The comparison is total cost to the buyer’s door, including the charges that only appear on a consolidated shipment.

The Cost Tariff Table

Charge LCL FCL
Ocean freight Per cubic metre Per container
Terminal handling Per shipment Per container
Documentation Per shipment Per shipment
Consolidation fee Yes No
Deconsolidation Yes No
Delivery order Yes Yes

The Hidden Table

Cost When it appears
CFS storage Delay at origin
Destination storage Late clearance
Rehandling Inspection
Repacking Damage
Waiting time Truck queue
Demurrage Container held

The Break Table

Variable Effect
Volume Scales up
Distance Scales up
Season Rate spike
Destination Port charges
Weight Limits
Value Insurance

Volume Weight and Light Cargo

Packing has more leverage on freight than negotiation does. A carton redesigned to remove three centimetres of void can cut the chargeable volume of a full order by a noticeable share, and that saving repeats on every shipment rather than once per contract.

Backpacks are light for their volume, which means the freight is priced on space rather than on mass, and that changes which packing decisions matter.

The Volume Code Table

Basis Applies
Gross weight Dense cargo
Volume weight Bulky cargo
Chargeable The greater
Conversion Carrier defined
Minimum Per shipment
Rounding Per unit

The Density Table

Cargo Density
Flat packed bags High
Stuffed bags Low
Foam panels Very low
Hardware Very high
Mixed cartons Medium
Retail boxes Low

The Lever Table

Action Effect
Compress bags Less cube
Smaller cartons Less void
Flat pack Much less
Remove inserts Less cube
Better stacking Less loss
Pallet choice Minor

How Consolidation Works

The practical consequence is that a consolidated shipment is not a single event but a sequence owned by different parties. Track the cargo receipt, the build confirmation and the arrival notice separately, because each one is a different organisation and a different failure mode.

A consolidated shipment passes through more hands than a full container, and each hand is a point where the cargo can be delayed or damaged.

Understanding the sequence matters because it explains who to chase when something goes wrong, and why the transit estimate is a range rather than a date.

The Sequence Table

Step Location
Factory pickup Origin
CFS receiving Warehouse
Groupage build Container
Export clearance Port
Ocean leg Sea
Deconsolidation Destination

The How Paper Table

Document Issued by
House bill Forwarder
Master bill Carrier
Cargo receipt CFS
Packing list Shipper
Manifest Consolidator
Delivery order Agent

The Responsibility Table

Stage Responsible
Until CFS Factory
CFS handling Consolidator
Container build Consolidator
Ocean Carrier
Deconsolidation Agent
Final delivery Haulier

Transit Time and Its Cost

Ask the forwarder for the last three actual door to door times on the lane, not the published transit. The published figure describes the ocean leg between two ports and says nothing about the eleven days your cargo may spend waiting for a build.

Consolidation adds days at both ends, and those days have a price that rarely appears in the freight quote.

The Time Table

Element Typical addition
Waiting for cut off Days to weeks
CFS handling Days
Groupage loading Days
Deconsolidation Days
Awaiting release Days
Delivery slot Days

The Transit Spend Table

Consequence Bearer
Late replenishment Buyer
Air upgrade Buyer
Lost sales Buyer
Storage Buyer
Discount Buyer
Reputation Both

The Transit Cushion Table

Situation Buffer needed
Stable demand Small
Promotional Large
New market Moderate
Seasonal peak Large
Perishable trend Large
Contract penalty Large

Mixed Cargo and Handling Risk

Ask the consolidator what share of the container is your cargo and what else is booked. A small consignment at the back of a container full of heavy machinery is exposed to a load path it was never designed for, and the carton damage that results looks exactly like a packing fault.

Sharing a container means sharing it with cargo you did not specify, packed by people you never met.

Workers loading mixed cartons and pallets into an LCL container
Workers loading mixed cartons and pallets into an LCL container

The Neighbour Table

Co loaded cargo Risk
Chemicals Odour, damage
Heavy machinery Crush
Wet goods Moisture
Loose parts Puncture
Food Contamination
Similar cartons Mis delivery

The Handling Table

Operation Risk
CFS unloading Drop
Sorting Mix up
Re palletising Instability
Container build Compression
De stuffing Cut damage
Handover Loss

The Mitigation Table

Measure Protects
Carton marking Identity
Pallet wrap Containment
Corner boards Edges
Desiccant Moisture
Photographs Evidence
Label count Accuracy

Documentation and Liability

Read the forwarder terms once, properly. The limits, the claim deadlines and the excluded cargo are all in a document nobody reads until the day they need it, and by then the deadlines have usually passed.

The bill of lading is the contract, and on a consolidated shipment the document a factory holds is usually a house bill rather than the carrier’s.

That distinction matters when a claim arises, because the contractual counterparty is the forwarder, not the shipping line, and the limits of liability are set by the forwarder’s terms rather than by the carriage convention.

The Bill Table

Type Issuer
Master Carrier
House Forwarder
Sea waybill Carrier
Cargo receipt CFS
FCR Forwarder
Switch On request

The Liability Table

Limit Basis
Per kilo Convention
Per package Convention
Declared value Optional
Insurance Separate
Forwarder terms Contract
Time bar Strict

The Documentation Cover Table

Cover Suits
All risks High value
Named perils Standard
Warehouse to warehouse Full chain
Institute cargo clauses Default
Excess Reduce premium
Claims made Rare

Damage and Shortage Claims

Notify early even when the loss looks small. Most regimes treat late notice as a bar rather than as a delay, and a signed delivery note without reservations is very hard to argue with afterwards.

Consolidated cargo generates more claims than full containers, and most of them are lost on evidence rather than on merit.

The Claim Table

Step Timing
Inspect on receipt Before signing
Note reservations On delivery
Photograph Immediately
Notify forwarder Days
Survey On request
Submit documents Deadline

The Evidence Table

Item Value
Load photos High
Seal number High
Carton count High
Receiving report High
Survey report Decisive
Driver statement Low

The Loss Table

Cause Frequency
Short landed Common
Mis delivered Common
Damaged Common
Stolen Rare
Delayed Frequent
Document error Frequent

Choosing a Consolidator

Check whether the forwarder operates its own station or sub contracts it. The difference shows up in how quickly a carton can be located when a buyer asks, and in whether anyone can describe the condition the cargo was in on arrival.

The consolidator decides the transit time, the handling quality and, in a dispute, whether you have someone to argue with.

A forwarder who is honest about cut offs and consistent about schedules is worth more than one who quotes a rate ten per cent lower and misses two sailings a quarter.

The Criteria Table

Criterion Why
Direct service Fewer handlings
Weekly cut off Predictability
Own CFS Control
Destination agent Claim support
Cargo mix policy Damage risk
References Reality check

The Question Table

Ask Reveals
Which sailings Frequency
Cut off day Planning
Transit range Honesty
Co loaded cargo Risk
Claim history Quality
Surcharges Total cost

The Red Flag Table

Signal Meaning
Rate far below market Hidden charges
No transit estimate No schedule
No agent named Weak claims
Cash only Instability
No CFS address Unknown handling
Vague cut off Missed sailings

Booking and Cut Off Discipline

A consolidated sailing cannot wait, so late cargo is not delayed by hours but by a week, and the cost of that gap lands on the party who missed the cut off.

The Booking Schedule Table

Stage Lead time
Booking request Days ahead
Space confirmation Days
Cargo ready date Fixed
CFS delivery Before cut off
Documentation Before cut off
Loading Fixed

The Booking Paper Table

Item Deadline
Commercial invoice Before CFS
Packing list Before CFS
Booking number On cartons
Export declaration Before loading
Certificate of origin Before departure
Insurance note Before sailing

The Booking Breakdown Table

Failure Consequence
Late delivery to CFS Next sailing
Missing documents Held at origin
Wrong weights Re measurement
Poor packing Rejected
Wrong marks Sorting delay
No booking number Not loaded

Peak Season Behaviour

Build the calendar backwards from the sailing you need rather than forwards from the production you can achieve. The result is a booking request that arrives before the space disappears, and a production plan that treats the cut off as a fixed constraint.

The weeks before major retail seasons change the economics of consolidation, because space tightens and rates rise faster than any break even calculation assumes.

The Season Table

Period Pattern
Pre holiday Space tight
Post holiday Rates fall
Summer Moderate
Typhoon season Disruption
New year Factory closure
Contract season Rate reset

The Rate Table

Driver Direction
Demand Up
Space Down
Equipment Tight
Surcharges Up
Transit Longer
Reliability Down

The Action Table

Timing Move
Early booking Secure space
Early production Meet cut off
Buffer stock Cover delay
Alternative port Bypass congestion
Rail option Reduce risk
Air budget Contingency

Destination Charges and Release Delays

The origin quote is only half of a consolidated shipment, and the destination half is where budget assumptions usually break.

Consolidated cargo attracts local charges that full containers avoid: deconsolidation, terminal handling billed per shipment, documentation fees and, frequently, storage while the consignee waits for a delivery order. Those charges arrive weeks after the freight invoice and are rarely included in the landed cost a buyer approved.

A factory that wants predictable landed cost should ask the forwarder for a destination charge estimate in writing before booking, and should treat any quote that excludes them as incomplete rather than competitive.

The Destination Tariff Table

Charge Basis
Terminal handling Per shipment
Deconsolidation Per shipment
Documentation Per bill
Delivery order Per shipment
Storage Per day
Haulage Per trip

The Destination Lag Table

Cause Days
Missing documents Days to weeks
Payment not received Until cleared
Customs query Days
Wrong consignee Days
No delivery order Days
Truck shortage Days

The Destination Spend Table

Charge Who pays
Origin charges Shipper
Ocean freight Per Incoterm
Destination charges Consignee
Storage Delay cause
Demurrage Container holder
Re delivery Consignee

When a Full Container Is Cheaper

There is a volume at which paying for empty space costs less than paying consolidated charges, and it is usually lower than exporters expect.

The calculation is straightforward: compare the all in LCL cost for the volume against the FCL rate plus destination charges, then divide the difference by the shipment’s value to see whether the extra inventory is worth financing.

The Compare Table

Element LCL FCL
Freight Per cubic metre Flat
Origin charges Per shipment Per container
Destination charges High Low
Transit Longer Shorter
Handling More Less
Damage risk Higher Lower

The Threshold Table

Volume Verdict
Under ten cubic metres LCL
Ten to twenty Compare
Twenty to thirty Usually FCL
Thirty plus FCL
High value light LCL
Low value bulky FCL

The Decision Table

Situation Choice
Test order LCL
Repeat order FCL
Two buyers shared Groupage
Urgent restock Air or FCL
Peak season Book early
Tight cash LCL

Holding Stock Versus Shipping Early

Consolidation encourages waiting for volume, and waiting has a cost that is easy to underestimate because it appears in lost sales rather than in a freight invoice.

The comparison is between the carrying cost of goods sitting in the factory and the margin lost when a replenishment arrives after the selling window. For fashion led bags with a short season, the second number is usually larger.

The Holding Table

Cost Nature
Warehouse space Fixed
Capital tied Financing
Obsolescence Risk
Insurance Small
Handling Small
Rework Occasional

The Holding Lag Table

Cost Nature
Lost sales Margin
Markdown Margin
Air upgrade Direct
Expedite fee Direct
Customer penalty Contract
Reputation Long term

The Balance Table

Signal Action
Short season Ship early
Long season Wait
Stable basics Consolidate
Trend items Ship fast
Large buyer FCL
Small buyer Groupage

Consolidating Multiple Factories

Buyers often consolidate goods from several factories into one shipment, and the factory that ships last sets the schedule for everyone.

The Coordination Table

Issue Effect
Different ready dates Waiting cargo
Different Incoterms Unclear control
Separate documents Sorting
Mixed carton sizes Poor build
Different labels Errors
Single bill One consignee

The Consolidating Code Table

Rule Reason
One booking reference Traceability
Carton list per factory Count
Common cut off Fairness
Photo per lot Evidence
Same marks format Sorting
Agreed penalty Discipline

The Risk Table

Risk Mitigation
One factory late Book later sailing
Mixed contents Inner labels
Claims confusion Per lot photos
Cost share dispute Written split
Damage attribution Retained samples
Communication gap Single coordinator

Insurance and Incoterms

The Incoterm decides who arranges carriage and insurance, and on consolidated shipments the answer is often less clear than the contract implies.

The Term Table

Term Freight paid by
EXW Buyer
FCA Buyer
FOB Buyer
CFR Seller
CIF Seller
DAP Seller

The Insurance Cover Table

Cover Gap
Seller policy Ends at named point
Buyer policy Starts when risk passes
Warehouse to warehouse Bridges gap
Consolidated cover Shared limit
Declared value Full recovery
Under insurance Average applied

The Insurance Audit Table

Question Why
Who books Control
Who insures Claim route
Where risk passes Liability
Is cover continuous Gap risk
Is value declared Recovery
Is claim time bar known Deadline

Documents That Prevent Delay

Most consolidated delays are document delays, and the fix is a checklist issued before the cargo leaves the factory.

Freight forwarder desk with booking documents and rate sheets
Freight forwarder desk with booking documents and rate sheets

The Pack Table

Document Purpose
Invoice Customs value
Packing list Count and marks
Booking number Identification
Declaration Export control
Certificate Preference
Insurance note Cover proof

The Error Table

Error Consequence
Weight mismatch Re measurement
Wrong HS code Inspection
Consignee mismatch Release block
Missing marks Sorting delay
Value understated Penalty
Copy documents Rejection

The Documents Schedule Table

Day Action
Minus seven Draft documents
Minus five Booking confirmed
Minus three Cargo to CFS
Minus two Declaration filed
Minus one Final check
Zero Loading

Measuring Freight Performance

Keep the numbers per lane and per mode, not aggregated. A programme that looks acceptable in total is often one good lane hiding a bad one, and the bad lane is where the margin has gone.

Freight is managed with three numbers: cost per cubic metre, transit reliability and damage rate, and all three should be tracked per lane rather than globally.

Container terminal with stacked containers and a cargo ship
Container terminal with stacked containers and a cargo ship

The Metric Table

Metric Definition
Cost per cubic metre Freight plus charges
On time rate Within window
Door to door days Actual
Damage rate Per thousand cartons
Claim rate Claims per shipment
Document errors Per booking

The Review Table

Cadence Decision
Per shipment Exception
Monthly Lane review
Quarterly Forwarder review
Per season Contract
Annual Tender
Per claim Root cause

The Benchmark Table

Measure Target
On time Above ninety
Damage Falling
Document errors Near zero
Cost Stable
Claims Rare
Visibility Daily

Working With Small Buyers

Small buyers generate the most consolidation work per unit and the least margin, so the service has to be standardised rather than customised.

The Service Table

Element Standard
Cut off Weekly
Minimum Cubic metre
Documents Template
Labelling Fixed format
Communication Email
Claims Written

The Working Spend Table

Item Handling
CFS charges Passed through
Consolidation Included
Documentation Per set
Storage Charged
Changes Charged
Cancellation Charged

The Expectation Table

Buyer belief Reality
Same speed as FCL Slower
Same handling More
No destination cost Always cost
Flexible cut off Fixed
Free storage Limited
Full control Shared

Route and Port Choice

Port selection changes consolidation economics more than most rate negotiations, because transit, congestion and destination charges all move together.

The Route Table

Factor Weight
Direct sailing High
Congestion High
Destination charges High
Inland distance Moderate
Frequency Moderate
Reliability High

The Route Alt Table

Option Trade
Direct port Faster
Transhipment Cheaper
Alternative port Variable
Rail leg Predictable
Feeder Slow
Barge Cheap, slow

The Route Audit Table

Question Data
Sailing frequency Schedule
Transit range Forwarder
Congestion Port reports
Charges Written quote
Free time Tariff
Reliability Own history

Payment Terms and Working Capital

Freight is paid before the goods are sold, and consolidation stretches that gap by adding weeks of transit to an already long payment cycle.

The Terms Table

Term Cash effect
Deposit Inflow
Balance on shipment Inflow
Against documents Later
Open account Latest
Letter of credit Bank controlled
Consignment Very late

The Payment Spend Table

Item Timing
Production Upfront
Freight At booking
Destination charges On arrival
Storage If delayed
Financing Monthly
Claims After resolution

The Control Table

Lever Effect
Shorter transit Faster cash
Fewer shipments Lower cost
Deposit terms Funding
Freight prepaid Margin
Consolidated invoice Admin
Claim discipline Recovery

Samples and Small Orders

Samples rarely justify consolidation, because the value of a sample is its arrival date rather than its freight cost.

The Sample Table

Method Suits
Courier Single sample
Express air Urgent approval
Consolidated air Several sets
Sea LCL Heavy samples
Hand carry Critical
Sea FCL Never

The Samples Spend Table

Method Relative
Courier High per kilo
Air Moderate per kilo
LCL Low per cubic metre
FCL Lowest per unit
Rail Mid

The Samples Code Table

Situation Choice
Buyer waiting Courier
Trade show Courier
Lab test Courier
Salesman set Air
Bulk pre production LCL
Approval pending Air

Seasonal Calendars and Cut Offs

A consolidation programme works backwards from the sailing, not forwards from the production plan, and the calendar is the tool that keeps those two aligned.

The Calendar Table

Event Lead time
Space booking Four weeks
Production finish Two weeks
Documents One week
CFS delivery Three days
Loading Fixed
Arrival Transit

The Slip Table

Cause Recovery
Late materials Next sailing
Quality hold Express option
Document error Re file
CFS congestion Early delivery
Port closure Re route
Blank sailing Rebook

The Seasonal Cushion Table

Customer type Buffer
Retail chain Four weeks
Distributor Three weeks
Online seller Two weeks
Promotional Six weeks
New market Five weeks
Contract Per penalty

Common Consolidation Failures

The same problems recur in consolidation programmes, and each one has a known prevention that costs less than the failure.

The Common Breakdown Table

Failure Cause
Missed sailing Late cargo
Damaged cartons Mixed loading
Shortage claim Count mismatch
Storage bill Late documents
Wrong consignee Data error
Lost visibility No tracking

The Prevention Table

Failure Prevention
Missed sailing Weekly cut off plan
Damage Corner boards
Shortage Photo count
Storage Pre clearance
Consignee error Two person check
Visibility Tracking routine

The Common Spend Table

Failure Typical cost
One week delay Storage plus sales
One carton lost Claim value
Re measurement Handling
Re booking Rate difference
Air upgrade Multiple of sea
Reputation Orders

Pre Shipment Checklist

Planning

Item Done
Volume measured ☐
LCL versus FCL compared ☐
Cut off confirmed ☐
Destination charges quoted ☐
Transit range accepted ☐
Insurance arranged ☐

Execution

Item Done
Documents drafted ☐
Cartons marked ☐
Count photographed ☐
CFS delivery booked ☐
Declaration filed ☐
Booking number on boxes ☐

Closure

Item Done
Bill checked ☐
Charges verified ☐
Tracking shared ☐
Arrival notice handled ☐
Claim window noted ☐
Invoice reconciled ☐

FAQ

At what volume does a full container beat consolidation?

Around twenty to thirty cubic metres on most lanes, but the crossover depends heavily on destination charges. A consolidated shipment pays per shipment at both ends, so once those charges are spread over a small volume they dominate. Run the comparison with an all in destination quote rather than with ocean freight alone, and repeat it per lane because port charges vary widely.

How much longer does LCL take than a full container?

Typically one to three weeks door to door, made up of waiting for the cut off, consolidation at origin, an extra handling step, and deconsolidation at destination. The variance is larger than the average, so plan the buffer from the worst recent transit you have seen rather than from the forwarder’s optimistic range.

Is damage more likely on a consolidated shipment?

Yes, for three reasons: the cargo is handled more often, it shares a container with unknown goods, and it is often built into the container by people who did not pack it. Corner boards, sealed cartons, clear marks and photographs at handover reduce the exposure substantially, and they are also what makes a claim arguable.

Who do we claim against if the cargo arrives damaged?

Usually the forwarder who issued the house bill, under their terms, rather than the shipping line. That is why the identity and reliability of the destination agent matter when choosing a consolidator, and why a survey at the destination is worth arranging quickly when damage is visible on arrival.

Can we consolidate goods from two different factories?

Yes, and it is common. The practical requirements are a single booking reference, a carton list per factory, consistent marks, photographs of each lot at handover, and an agreed penalty for the factory that misses the cut off. Without those, one late factory silently delays the other’s cargo and the cost argument follows.

Does consolidation save money on light cargo such as backpacks?

It saves compared with air, and it saves compared with paying for a container you cannot fill. It does not necessarily save compared with a slightly delayed full container, because backpacks are bulky and the cubic metre rate applies to a lot of empty air inside the carton. Compressing the bags and reducing void inside the carton often saves more than switching transport mode.

How should freight cost be quoted to a buyer?

As a landed cost estimate covering origin charges, ocean freight, destination charges, insurance and inland delivery, with the assumptions stated: volume, chargeable weight, transit range and validity. A single ocean freight figure is not a quote a buyer can budget from, and it is the most common source of dispute when the arrival invoice appears.

What is the single biggest operational risk in a consolidation programme?

Missing the cut off. A consolidated sailing has a fixed build time and cannot wait for one carton, so a late delivery to the CFS turns a two day delay into a one week delay and sometimes into a rate change. Production planning that works backwards from the sailing date, rather than forwards from the material arrival, removes most of that risk.

Conclusion

Consolidation is a tool with a clear use: moving volumes that are too large for parcel and too small for a container. It becomes a problem when it is used to avoid a decision about inventory, because the delay it introduces is paid for in margin rather than in freight.

The workable approach is unglamorous. Measure the volume, get a full destination quote, compare against a full container at the realistic threshold, state the transit range in the buyer’s terms, and treat the cut off as a production deadline rather than a shipping detail.

Then measure what happens: cost per cubic metre, on time rate and damage per thousand cartons, per lane. Those three numbers will tell you when consolidation is genuinely paying off, and when the saving on the freight invoice is being spent somewhere else in the chain.

Container Freight Station Operations

The CFS is where a consolidated shipment is actually created, and its standards decide whether the cargo enters the container in the condition it left the factory.

The Receiving Table

Check Standard
Carton count Matched to list
Condition No crush
Marks Legible
Weight Checked
Photograph Per lot
Location Placed, not stacked high

The Build Table

Element Practice
Weight distribution Balanced
Stacking Within limits
Separation By consignee
Bracing Gap filled
Documentation Per lot
Seal Numbered

The Handover Table

Item Proof
Cargo receipt Signed
Damage noted Written
Photos Timestamped
Seal number Recorded
Loading plan Filed
Claim route Stated

Parcel and E Commerce Fulfilment

Some bag ranges ship as parcels straight to consumers, and the decision between parcel and consolidated freight follows a different logic from wholesale.

The Mode Table

Mode Suits
Courier express Single units
Postal Small parcels
Consolidated air Batch of orders
LCL sea Bulk stock
FBA direct Platform rules
Third party warehouse Buffer stock

The Parcel Spend Table

Mode Cost basis
Courier Per parcel
Postal Per parcel weight
Air Per kilo
LCL Per cubic metre
FCL Per container
Storage Per pallet day

The Choice Table

Volume Mode
Under fifty units Courier
Fifty to five hundred Air
Five hundred to two thousand LCL
Two thousand plus FCL
Replenishment Per forecast
Launch stock Air plus sea